Laser Electrical Ballarat has worked with many local organisations and businesses. Here are just a few of our valued clients.

Werribee Water Treatment Plant - Tedra

  • Installation of 22kv mains
  • Installation of 2x 22kv - 415v transformers
  • Installation of 22kv switchgear
  • Installation of all mains and sub mains
  • Installation of LV motor control centres
  • Installation of fibreglass cable trays and conduit
  • Cabling to all motors and instruments
  • Testing of all motors and instruments
  • Installation of optic fibre for PLC networks and CCTV
  • Installation of cathodic protection for pipework and tanks
  • Installation of lightning protection system
  • Assist with commission of entire plant

AusWest Timbers - Dean Mill WA

  • Installation of Category rated safety system for approximately 200 motors

Laucke Flour Mills - New Flour Mill, Bridgewater on Loddon, VIC

  • Design, construction and installation of new 3000amp main switchboard
  • Design, Supply and installation of PLC control panel
  • Design, programming and implementation of PLC and SCADA systems to control the new flour mill
  • Installation of new consumers mains
  • Installation of new sub-mains to Load Centres and DB boards
  • Design and Installation of cable trays throughout the building x 5 levels
  • Installation of power and control wiring for approx. 240 motors
  • Supply and installation of approx. 220 sensors
  • Installation of general light and power
  • Supply and installation of Kaeser Compressor
  • Supply and installation of pneumatic ring main and final pneumatic distribution
  • 16 electricians on site
  • Maintenance and support
  • Testing and Commissioning

Tenix Alliance / Central Highlands Water - Waste Water Reuse Plant

  • Installation of all power and instrumentation wiring
  • Installation of Cable trays and steel conduits
  • Installation of underground sub-mains
  • Testing & Commissioning of project

Veolia Water - LGL Ballarat Goldfields Water Treatment Plant

  • Installation of underground sub-mains
  • Installation of below slab conduits for field wiring
  • Installation of all power and instrumentation wiring
  • Installation of general light and power
  • Installation of grading earths
  • Supply and installation of pneumatic distribution
  • Supply and installation of Chemical fill point control panels
  • Testing and commissioning

Botanical Resources Australia (Ballarat Pelletising Plant)

  • Electrical design and automation for pelletising plant
  • Pelletising Plant Automation design and installation

Botanical Resources Australia (Ulverstone Pelletising Plant)

  • Pelletising Plant Automation Upgrade
  • Pelletising Plant Electrical Upgrade
  • Wire-in additional pellet press
  • Electrical maintenance
  • Electrical installation work for harvester wash down bay

Tenix Alliance - Joe White Maltings Water Treatment Plant

  • Installation of all power and instrumentation wiring
  • Installation of Cable trays and steel conduits
  • Installation of underground sub-mains
  • Testing & Commissioning of project

Eclipse Ford - Ballarat

  • New showroom and offices general light, power and data
  • Energy efficient lighting upgrade
  • Service and maintenance

Satake Australia - Australasia

  • Design, programming and implementation of PLC and SCADA systems to control various plants across Australasia
  • Electrical design and upgrade to existing plants
  • Design and construction of New Motor Control Centres to suit each plant
  • Electrical installation works for all new motors and control devices
  • Testing and commissioning
  • Supervision and training of plant staff

Powercor Network Services - Waubra Terminal Station

  • HV Operations
  • 24hr First Response for faults or breakdowns
  • Weekly / Monthly Site Inspections

LGL Ballarat Goldfields - Elsworth Street (66Kv Sub Station)

  • Installation of all structural steel
  • Installation of earth grid and copper bar earthing throughout station
  • Installation of main 66 - 11Kv Transformer
  • Installation of station services 11Kv-415v Transformer
  • Installation of 11Kv Power Factor Correction Unit
  • Installation of Schneider Electric 11Kv Circuit Breaker Switchboard
  • Installation of all Control / Protection Wiring
  • 66Kv Aerial Conductors
  • X&Y Protection Control Wiring
  • Installation of 66Kv Circuit Breaker
  • Installation of 66Kv Rotary Isolator
  • HV Commissioning & Testing

Saizeriya Australia Pty Ltd - Melton Plant Upgrade

  • Installation of all power and instrumentation wiring
  • Installation of Cable trays and steel conduits
  • Installation and termination of all sub-mains as requested
  • Testing & Commissioning of Project
  • In recognition of Laser Electrical Ballarat efforts for being on time and under budget, the CEO and Board of Directors in Japan sent Laser Electrical Ballarat a personal thankyou and presented a glass plaque.

Woods Grain Pty Ltd- Goondiwindi

  • Design, programming and implementation of PLC and SCADA systems to control the splitting and stock feed plants
  • Supply and installation of 3 x Kaeser Compressor units
  • Supply and installation of pneumatic ring main and final pneumatic distribution
  • Design and construction of new motor control centre incorporating 270 motors
  • Supply and installation of power and control wiring
  • Testing and commissioning
  • Ongoing Maintenance

SMC Specialized Mining Services - Golden Point Shaft Construction

  • General electrical start up of generators and electrical safety checks of all electrical equipment
  • Site Establishment and installations
  • General shaft maintenance and repairs
  • 24hours 7 day a week emergency breakdown

Unigrain - Smeaton (Oat Mill Construction)

  • Design, construction and installation of new 2000amp main switchboard
  • Design, programming and implementation of PLC and SCADA systems to control the oat packing lines
  • Installation of new consumers mains
  • Installation of new sub-mains to Rolled Oat Mill
  • Installation of cable trays throughout the building
  • Installation of power and control wiring for 155 motors
  • Instrumentation wiring
  • Installation of general light and power
  • Supply and installation of Kaeser Compressor
  • Supply and installation of pneumatic ring main and final pneumatic distribution
  • Design, Supply and installation of outload control panel
  • Fire Detection System
  • 22 electricians on site
  • Maintenance and support
  • Testing and Commissioning

Findlay Engineering - KR Castlemaine Product Conveyors

  • Supply and installation of 5 x MCC Panels for control of product conveyors in various areas of the plant
  • Supply and installation of power and control wiring and supports to site specifications
  • Supply and installation of Allen Bradley PLC’s and programming
  • Design, commissioning and as built drawings

Austral Bricks - Wollert Factory Upgrade

  • Supply and installation of 22kV cable to three new kiosk substations
  • Supply and installation of LV mains from each kiosk - 3200A each
  • Supply and installation of power and control wiring for fine clay storage bins

Gekko Systems

  • Electrical and Electrical Engineer labour hire to factory and onsite nationally and internationally
  • Supply and installation of LV distribution and MCCs
  • Electrical installations for new factory
  • Gekko supplier of the year 2010

VicTrack / Abigroup (Bombardier Rail Maintenance Facility) - Ballarat

  • Upgrade site power
  • Installation of New MSB
  • Installation of 7 New light & power Distribution Boards
  • Installation of PA System, Phone, Data, General Light and Power
  • Install Cable Tray throughout building
  • Install Automated Lighting System
  • Design and construct signalling control panels

Hazeldenes (Bendigo, VIC) - FairBrothers

  • Extension to High Voltage reticulation
  • Establishment of new open type sub-station including excavation and concreting
  • Design and construct 7 new motor control centres
  • Installation of power and control wiring to 120 motors
  • Design and implementation of plant safety systems

LGL Ballarat Goldfields

  • Stage One, Two & Three Processing Plant
  • Installation of HV Cable and 11Kv Kiosk Sub Station
  • Installation of Earth Grid
  • HV Commissioning
  • Device net cabling and remote I/O control wiring
  • Supply & Installation of all cable tray, power and control wiring throughout plant
  • Establishment of switch room including PLC, VSD’s and Soft Starters
  • Low Voltage Distribution
  • Dayshift & nightshift general maintenance
  • Commissioning of project
  • NECA Award Finalist 1999

Sampson Grain - Albany, W.A.

  • New 18,000T grain storage facility
  • Supply and installation of low voltage distributions
  • Supply and installation of MCC including soft starters, VSD’s, PLC, SCADA, and modem for remote diagnostics/monitoring
  • Field wiring to 45 motors, diverter boxes, slide gates, and paddle switches
  • Supply of silo humidity probes and weather monitoring station

BHP Billiton Olympic Dam SA

  • Major smelter shut down
  • Supply and installation of new cable tray from substation to waste heat boiler
  • 10 electricians on site
  • Supply and installation of power and control wiring for automated sliding door on the waste heat boiler
  • Design, construction and installation of sliding door control panel
  • Testing and Commissioning

Testimonials

At Wayne Phillis Ford & Kia, we rely on the prompt and reliable service of Laser Electrical at all our locations. We have found them to be a one-stop-shop for all our phone, data and electrical requirements, and their after hour service is also outstanding. The Laser office staff and electricians are friendly, cheerful and competent."

Wayne Phillis


We here at Glenelg Plumbing use Laser Electrical. We have always found their service to be prompt, reliable, efficient and helpful."

The Team
Glenelg Plumbing


Thanks for the latest wiring job – done with very prompt efficiency. Everyone I spoke to was a credit to your business."

Alex


We can't speak highly enough of your electrician… He is a great young man and he did a very thorough job…Thanks again for a job well done."

Trevor


Your electrician was very helpful in explaining things and communicated well. He was friendly and represented your company extremely well. Laser Electrical is fortunate to have such a fine team of workers."

Chris


Contact us today to discuss what we can do for you.


Save Money with Laser!

Claim your free energy saving guide, jam packed with super saving tips!

Enter your Email